Optimization of the Production Process of Forging Dies for Piston Wheel Cylinders using Value Stream Mapping and the 7 Wastes Method
DOI:
https://doi.org/10.21776/MECHTA.2026.007.02.9Keywords:
Dies Forging Piston Wheel Cylinder, Value Stream Mapping, 7 Wastes, Production Efficiency, Lean ManufacturingAbstract
Improving production efficiency is an important challenge in the manufacturing industry, particularly in automotive component production. This study analyzes the production process of Dies Forging Piston Wheel Cylinder (DFPWC) using Value Stream Mapping (VSM), 7 Wastes analysis, Fishbone Diagram, 5W+1H analysis, and Failure Mode and Effects Analysis (FMEA). The analysis was conducted to identify non-value-added activities, determine the root causes of production delays, and develop improvement strategies. The current-state VSM showed a total production time of 6,478 minutes, with 5,028 minutes identified as non-value-added time. The main problems included waiting caused by unavailable jigs, operators performing multiple tasks, inadequate machine maintenance, and insufficient control of supporting materials. Based on the identified causes and FMEA results, a future-state VSM was developed. The proposed improvements reduced the total production time to 6,270 minutes and non-value-added time to 4,820 minutes. These results indicate that the integration of VSM with waste and root-cause analysis can support the development of improvement strategies for reducing production delays and improving process efficiency.
References
[1] D. S. Bowo, “Analisis Perbaikan Proses Produksi pada PT Sumber Teknik Sentosa,” Jurnal Manajemen Bisnis, vol. 8, no. 1, pp. 19–28, Apr. 2018. DOI: 10.22219/jmb.v8i1.7049.
[2] Y. Maulana, “Identifikasi Waste dengan Menggunakan Metode Value Stream Mapping pada Industri Perumahan,” Jurnal JIEOM, vol. 2, no. 2, pp. 12–20, Nov. 2019. DOI: 10.31602/jieom.v2i2.2934.
[3] A. K. Sahoo, R. B. Singh, and S. Shankar, “Process optimization by value stream mapping,” Procedia Manufacturing, vol. 51, pp. 1727–1734, 2020. [Online]. Available:https://www.sciencedirect.com/science/article/abs/pii/S2214785321057497.
[4] M. Kholil, H. Hendri, B. Hanum, and R. Setiawan, “Using 7 Waste Approach and VSM Method to Improve the Efficiency of Mackerel Fish Crackers Production Time at Small Medium Enterprise (SME),” in Proceedings of the International Conference on Industrial Engineering and Operations Management, Bandung, Indonesia, Mar. 2018, pp. 2819–2826. [Online]. Available: https://ieomsociety.org/ieom2018/papers/657.pdf.
[5] Palange, Atu & Dhatrak, Pakanji. Lean manufacturing a vital tool to enhance productivity in manufacturing. Materials Today: Proceedings 46, 729-736 (2021). [Online]. https://doi.org/10.1016/j.matpr.2020.12.193.
[6] S. M. Shankar, R. B. Singh, and A. K. Sahoo, “Application of lean manufacturing using value stream mapping in an automotive industry,” Procedia Manufacturing, vol. 51, pp. 1720–1726, 2020. [Online]. Available: https://www.sciencedirect.com/science/article/abs/pii/S2214785322022945.
[7] A. Faulkner and F. Badurdeen, “Sustainable value stream mapping (Sus-VSM): methodology to visualize and assess manufacturing sustainability performance,” Journal of Cleaner Production, vol. 85, pp. 8–18, 2014. [Online]. Available: https://doi.org/10.1016/j.jclepro.2014.05.042.
[8] Kamble. N, Swati & Rajiv, B. Significance of risk priority number in machine condition monitoring. Materials Today: Proceedings 50, 1930-1935 (2022). [Online]. https://doi.org/10.1016/j.matpr.2021.09.317.
[9] Sirajudeen. S, Rahima & Krishnan Aravind, K. Application of lean manufacturing using value stream mapping (VSM) in precast component manufacturing: A case study. Materials Today: Proceedings 65 part 2, 1105-1111 (2022). [Online]. https://doi.org/10.1016/j.matpr.2022.04.159.
[10] A. Meudt, A. Metternich, and E. Abele, “Extension of value stream mapping 4.0 for comprehensive consideration of information flows,” The International Journal of Advanced Manufacturing Technology, vol. 120, pp. 1–20, 2023. [Online]. Available: https://link.springer.com/article/10.1007/s11740-023-01207-5.
[11] A. Y. Pradana, “Peningkatan Produktivitas Produksi Kain Batik Menggunakan Metode Lean dan Kaizen di UMKM Sanggar Batik Jumputan Maharani,” Jurnal DISPROTEK, vol. 11, no. 1, pp. 1–6, 2020. DOI: 10.34001/jdpt.v11i1.884.
[12] S. Mangalatahu, Hwang S.H., and Jeon J.S., “Failure mode and effects analysis of RC members based on machine-learning-based SHapley Additive exPlanations (SHAP) approach” Engineering Structures, vol. 219, 110927, 2020. [Online]. Available: https://doi.org/10.1016/j.engstruct.2020.110927.
[13] Hwang, YM., Lu, CY., Lin, GD. et al. Die design and finite-element analysis for the hot forging of automotive wheel frames made of aluminium alloy. Int J Adv Manuf Technol 137, 2681–2695 (2025). [Online]. https://doi.org/10.1007/s00170-025-15340-1.
[14] Wei Min, et al. Development of high-throughput rapid heat-treatment and characterization process. Acta Materialia 261, 119365 (2023). [Online]. https://doi.org/10.1016/j.actamat.2023.119365.
[15] L. Kartika and S. Dony, “Penerapan Lean Manufacturing untuk Mengidentifikasi Waste pada Proses Produksi Kain Knitting di Lantai Produksi PT. XYZ,” in Prosiding Industrial Research Workshop and National Seminar, vol. 10, no. 1, pp. 567–575, 2019. [Online]. Available: https://jurnal.polban.ac.id/proceeding/article/view/1519.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Dewi Auditiya Marizka, Farras Adiprasetyo, Falahi Rozzan , Jubair Azhar Rahman Gibran , Febrian Adiputra Suwanto , Adji Ningrat Isma Pratama

This work is licensed under a Creative Commons Attribution 4.0 International License.